On November 5 2021, the inauguration of the new Laminam production line  was held at the plant in Borgo Val di Taro (Parma). Studio 1 is pleased to have contributed to the success of the production plant doubling   by providing all the automation for the  7 floors  dryer loading / unloading , double channell  kiln loading / unloading  and the slabs  selection line. Thanks to Laminan for the renewed trust and continuity in an already consolidated collaboration.